City of Canning – Riverton Café Fit-out

Relevant Details Kitchen & Service Counter Fit-out of the Riverton Café including Supply of Equipment. Evidence of Competency and Sound Judgement Dealing with Swan River Trust issues. Set up stakeholder meetings. Issuing tender documentation and evaluating completed tenders. Scheduling of project . Scope of Involvement Including Outcomes and Issues Project management & financial control of […]

Consolidated Travel – Office Refit

Relevant Details DCCM carried out extensive refit and rearrangement works within the operating office of Consolidated Travel. Work scope for the second re-fit included demolition and installation of partitions, air conditioning, power & lighting, removal & installation of work stations and the management of overall security throughout the process. Evidence of Competency and Sound Judgement […]

Horizon Power – Term Contract – Various Works

Relevant Details Project management and maintenance services for all of Horizon Power’s regional properties. The sites include owned and leased houses and depots. Project Management of multiple commercial projects. Management of design team. Management of building and civil contractors and all trades. Liaison with multiple departments within Horizon Power. Development of a Planned Maintenance Program […]

Horizon Power – Karratha Depot – Fire Fighting System

Relevant Details Design, supply & install a fire fighting system for the depot consisting of a fire pump set, water tanks, fire hydrant & hose reel systems and connection to the fire indicator panel. Evidence of Competency and Sound Judgement Confirmed code requirements and WA government regulations with DFESA, Hydraulic and Fire System Consultants. Developed […]

Horizon Power – Washdown Bay, Bunded Store, Hardstand & Drainage

Relevant Details Design, supply & install a truck wash-down bay, a covered bunded storage area, bituminized hardstand, stormwater drainage and compensating basin. Evidence of Competency and Sound Judgement Researching of the various truck washdown bays from portable to build in situ. With cost benefit analysis carried out to identify that the built in situ method […]

Horizon Power – Staff Carparking

Relevant Details Design, supply & install a staff car parking area for the Horizon Power Broome Depot. Evidence of Competency and Sound Judgement Dealing with heritage issues at Broome for the additional staff car parking. Set up stakeholder meetings. Co-ordinated with heritage consultants and local indigenous communities. Developing scope of work and tender documentation. Issuing tender […]

Perth Transport Authority – Maintenance Depot Improvements

Installation of external platform and internal elevated platform and fall barrier within the maintenance depot. Works included: Excavation and construction of  reinforced concrete foundations Site dimensioning, shop drawing & fabrication of structural steel including handrails, stairs & barriers Installation of platforms & barriers including platform edging to critical tolerances

Perth Transport Authority – Smart Rider Ticketing system

Installation of the fare gates, fencing, power & communications infrastructure for the new SmartRider ticketing system. Work included: Mechanical, air conditioning, electrical & communications works Removal & replacement of ticket vending & validating machines Transit guard booth As built drawings and manufacturer’s data records

ABB – Collie Power Station

Removal of epoxy rendered finish to the lower 6m of the chimney stack. Application of surface treatment and concrete repair work using epoxy products. Key features of this project: Working at height Working within an operating Power Station Completed on time and budget with no safety incidents or lost time.

ABB – Office Fit-out

Fit-out of level 5 office area. Scope included salvage, modification, repair and installation of existing partitions and furniture. Painting, signage and final clean. Key features of this project: Critical program period Completed on time and budget